Challenge

The Southeastern Pennsylvania Transportation Authority decided to contact Quality Concrete when they had settlement issues on two rail lines at a road crossing in Ambler, Pennsylvania. The Gwynedd Train Station had 14” thick concrete slabs supporting the track with settled areas as much as 1-7/8” inches. For passenger trains, safely navigating this area of the tracks required a 40 mile per hour reduction in speed. SEPTA’s main concern with the project and repair was for the safety of their passengers, as continuedsettlement could lead to potential derailment. Additionally, minimizing the disruption to train schedules during repairs would require keeping oneof the 2 tracks in service at all times. Slab replacement was not as option due to the expense,time and disruption it would cause to both street traffic and SEPTA trains. Previous attempts to lift settled rail slabs with mudjacking were not precise and were prone to washouts over time. With the use of the PolyLEVEL System from Quality Concrete, SEPTA was able to meet all of their goals and fix the problem at hand.

Solution

About the author

Jazz Pared